Saturday, January 19, 2013

January 20th, 2013

Managed to get everything rearranged so that I could fit the Van back in the garage. With the fuse on sawhorses for the last week or so I haven't been able to. Ran down to Harbor Freight at lunch early in the week and picked up a couple of their large moving dollies. I put the 2x4 stretchers on the saw horses to make them wider, then bungied the dollies to the saw horses. That makes the fuselage easily moveable so I can pack everything back on one side again. This week I worked on match drilling the longerons to the fuselage.  Doesn't sound like much, but it takes a while.  The longerons are 1/8" angle and 15 feet long (give or take a smidge).  There is a hole to drill about every inch. Match drilling the skins to the left longeron. The fuse is upside down at the moment, so this is the left side. The longerons are a single 15 foot section of 3/4 x 3/4 angle 1/8" thick. Takes a while to drill that much. There is one on each side.
From Fuselage
Working down the right side. Clecoes in every other hole. I then went back and drilled the in between holes. \
From Fuselage
Here's the right side done up to the F-904 bulkhead.
From Fuselage
Once it's riveted up to the 904, the longerons are trimmed to length (about 3/4" less than the skin), then the rest of the longerons are match drilled.

Monday, January 14, 2013

January 13th, 2013

With travelling, work and the holidays I didn't have a chance to do any updates to the log.  Rather than go back and try to create the missing month or so, I'll just hit the highlights.

Basically I finished up the center section, riveted it, clecoed it to the completed tail cone, added the longerons (just "slipped in place" as Van's calls it), then added the side skins and started working through the next steps.  There will be a lot of work before anything gets riveted again.

Center section:

The remaining work was mostly match drilling, deburring, cutting some holes for wiring bushings, dimpling everything and then riveting it.

Once I clecoed everything together, I decided it would be easiest to stand it vertically.  That way Becca could hold the bucking bar on one side and I could back rivet from the other with the long rivet set.  It worked well.

Before riveting.  The section is oriented nose down.  The bulkhead against the table is the aft half of the spar carrythrough (the wings will bolt to that).  The middle bulkhead that sticks out is where the seat backs will ultimately attach.  The lower ribs are where the seat bottoms will be.  The upper ribs support the baggage area.


From Fuselage
Here's the other side before we riveted.

From Fuselage

We were able to back rivet 80% or more of the rivets. Had to buck the tight spots. Becca and I were able to knock it out in about an hour. Thanks Becca!

Here is the completed center section after riveting.

From Fuselage

Here I've added the baggage and seat skins.  This stiffens the structure even more and gives you a much better idea of what it will look like.  The square holes on the lower skins are where the control sticks will eventually go.  The elevator pushrod will fit inside the open slot that goes aft from the seats.  That will be covered by a "tunnel" to protect it.

From Fuselage

This is what it will look like in the aircraft. Yes, I tried sitting on it (of course...)

From Fuselage


Once that was done it was time to mate the center section with the tail cone.

Basically everthing gets flipped upside down and supported on saw horses.  The idea is to line everything up, slide the longerons into the two sections, then cleco everything together.  There is a lot of fitting and opportunity for things to not line up very well.  I had to go at it two or three times before I could get it hooked up.  For me, the key turned out to be starting with the aft line of rivets on the bottom, then adding the side skins and start with the aft line there as well.  Once I did that it all fit very nicely.

Here it is all clecoed together - the sides haven't been added yet

From Fuselage

Everything is together and I've verified (amazingly) that the longerons were almost bang on.  Everything lines up and I'm getting ready to drill the step holes, then bend the side skin (the "shark fins" sticking up on each side) to fit the tail cone.

Bending the shark fins to fit is pretty tricky.  The forward part is almost a tight 90 degrees.  The aft part is a gentle curve.  All that is accomplished in about 12" of skin.

From Fuselage

Drilling the side skin for the boarding step.  Steps are optional (not really needed on a tail dragger).  Since mine is a tri gear I'll have them on both sides.


From Fuselage

Trimming the 623 rib to provide clearance for the step tube.


From Fuselage
One the the side skins after bending.  Hard to get everything just right on these.

From Fuselage

Unfortunately, the first skin I did (right side) ended up cracking slightly just aft of the relief hole :<.

I must have bent it a bit too far (or too often).  Stop drilling will take care of it spreading.  The step plate will be riveted over this area which will make it super strong.
\
From Fuselage

Wednesday, December 5, 2012

December 9th, 2012

A lot of non-airplane building stuff has been going on the last few weeks so progress on the tail cone has slowed somewhat.

 Last Friday I took a day off that also happened to have some good weather, so I finished priming some of the parts I'd had to put off.

 I primed the J stringers, the two longerons, reinforcing angles for the bulkheads, the last part of the F706 bulkhead that had not been primed as well as the baggage ribs so all the center section would be ready.  One of these days I'll remember to take a picture.  There is a lot going on with getting all the parts cleaned for painting, mixing up the paint (it's a 2 part epoxy primer) then letting it "cook" for 30 minutes.

Next step was to remove the vinyl along the rivet lines, then debur and dimple all the skins, bulkheads and J stringers. Once that was done it was time to reassemble the tail cone and start riveting.

 The F779 bottom skin is a pretty heavy piece - .040" thick. When I was match drilling it was very difficult to get it all pushed up so I could match drill the holes and J stringers. This time I put a little more pre-bend on the skin, then put it in by itself before adding the F711 and F712 bulkheads. The fit was *much* better not to mention it was way easier to get everything lined up and clecoed in place.

Van has you start off riveting the two aftmost bulkheads (F711 and F712), then the F779 bottom skin at the tail, then finally the main bottom skin.

Here is a shot of the tail cone as I'm starting to rivet it. I was able to use the squeezer on most of the F712 (furthest aft) bulkhead and a lot of the F711 bulkhead. You can see an elliptical hole on the lower forward part of this shot. There are two of these (one on each side) that will be where the rudder cables will exit the fuselage and attach to the rudder, which will be attached to the aftmost bulkhead.

From Fuselage

Next they have you start working forward along the lower J stiffener line, riveting the J stringer, side skin and F779 bottom tail skin together.


From Fuselage


From Fuselage
Becca helped me with back riveting the tail cone bottom skins.  It would have taken me a few hours to get as much done as she and I did in 30 minutes.

Here is the cone with all the bottom skins riveted on (it is laying on its left side).  This is looking from the tail forward.  Basically this section will be from the back side of the canopy aft.  The baggage compartment, seats/cockpit and engine will all attach to the forward section of this piece.  The tail will attach to the near end.

From Fuselage
On Saturday I finally finished riveting the tail cone.  I did a quick guesstimate count - close to 1000 rivets in this dude.  Took a while.  Back riveted almost all of it.  The entire assembly probably weighs less than 30 pounds.  Amazing how light all this stuff is.

From Fuselage
Here's a view looking aft inside the tail cone.  The lengthwise J-stringers add considerable strength.  The F706 rib in the foreground will be riveted when the center section and tail cone are riveted together.

The vertical member is for the elevator bellcrank assembly.  There is a pushrod from the control sticks that passes through the small hole at the bottom, attaching to the bellcrank which will later be mounted just aft of the bulkhead.  The elevator pushrod will continue aft through the large round hole in the far bulkhead and attach to the elevator.

From Fuselage
Next step is to start working on the center section.  The plan view is below.  The aft bulkhead supports the seat back.  Aft ribs are baggage floor ribs.  Forward ribs support the seats.  The forward bulkhead is the main spar carry through structure.

From Fuselage

Started fabricating the seat shims from 1 1/2" bar stock.  4 required.

From Fuselage

4 of the seat ribs have to have the forward holes enlarged to provide clearance for the control columns.  Two will be cut for an access plate cover.  I used a standard hole saw in the drill press to cut the ribs.  Worked great.

From Fuselage

Here are the 2 916 L + R inboard ribs after the holes have been cleaned up.

From Fuselage
From Fuselage
Plan of the two ribs that have to be modified with access plates.  Should finish those up tomorrow.

From Fuselage

Finished up prepping the two access ribs, then riveted up all the seat rib nutplates.  Next step is to cleco the aft portion of the F904 bulkhead to the seat ribs, the F705 bulkhead and the baggage ribs.


From Fuselage
Then you cleco on the skin. I decided to flip it upside down to do that.
From Fuselage
Here's another view from underneath.
From Fuselage
Had some fit issues with the two center baggage ribs (F727 L+R) and the F705 bulkhead. Turned out to be interference between the rib spacers on the two access ribs and the seatbelt anchors. Once that was cleared up everything went together correctly.

Thursday, November 22, 2012

November 25th, 2012

Finally got to put some larger parts together this week.  Nice to have something that is looking like the tail of an aircraft.

This week I finished up the longeron bends, then started assembling the tail cone.

Since I'd finished up the aft ends of the longerons in my last session, it was time to bend them as prescribed in the plans.  There are a couple of things that fall into the "dreaded tasks" category among RV builders, and this is one of those tasks.  You're going to take a nearly 15 foot long piece of aluminum angle, put a pretty significant curve in it (all while keeping it flat), then put a vertical bend in it (also keeping that straight), then twist it almost 20 degrees.  Fun note in the plans - "if you are within 1/16" of the template that should be adequate".  Love the understatement. :)

Plans page for the longerons:

From Fuselage


I don't have much in the way of pictures.  Basically you clamp it tightly in a vise (after a gazillion double-checks to make sure you really are bending it in the right direction), put a pre bend on it, then whack it with a rubber mallet (I used a deadblow hammer).  Move it an inch, do it again, etc.  Once you think you're close to what they want, lay it against the paper template to see how you did.

Repeat.  Take the unwanted bend out (oops, you mean you straightened it out more than you wanted when you made it level again???  try again).

Here's what it looks like when I'm getting close.
From Fuselage
The first bend on the right longeron took me nearly 2 hours before I was satisfied.
From Fuselage


From Fuselage
From Fuselage
From Fuselage
From Fuselage

Sunday, November 18, 2012

Nov 18th, 2012

This week I finished up the F705 bulkhead assembly, then did the F706, F707, F708, F711 and F712 bulkheads.  Kind of nice working on the tail cone guys.  Not much to them.

Last week I fouled up a couple of the seat belt attach brackets.  Failed to notice some of the fine print on the edge of the plans and made a mistake match drilling them.  I ordered a couple more.  They arrived this week and I match drilled them to the F705B bar.


The F711 bulkhead is another two part unit. There are two basically identical bulkheads that get riveted back to back. The top center section is trimmed out per the plans to provide clearance for the elevator pushrod tube to connect to the elevators. Two large 1/4" flat aluminum bars provide reinforcement on each side and stick up vertically above the bulkhead. These will be used later to attach the empennage to the fuselage.
From Fuselage
Riveting the two bars to the F711 bulkhead.


From Fuselage
Completed F711 assembly.
From Fuselage
The last thing I did this week was dig out the longerons. It's finally time to use them. They came with the wing kit almost a year ago and have been hanging on the wall waiting for the day I could use them. The longerons are each about 15' long and have to be trimmed down to 173 7/16" inches. I must have checked the measurement a dozen times before I finally did the cut. Do *not* want to have to get another one of these because I messed up. The first thing they have you do is mark them up for left/right up/down fore/aft so there is absolutely no doubt about which is which. Then a couple of slots and a tang are cut out of the aft end to provide clearance for the F711 bars. Here's a shot of the cuts after they were more or less done.
From Fuselage
Next week I'll do the bends. Then it will finally be time to rivet some of the pieces together.

Sunday, October 28, 2012

October 28th, 2012

Spent most of the week either working, doing chores, or in Atlanta at Becca's last big band competition. They did well, but missed finals by 1/10th of a point, which was a bit disappointing. They did very well though, and had a lot of fun. It was great to get to go so see them compete against so many excellent bands from all over the south.

 This week I finished up the 904 bulkhead assembly. Started off installing nutplates all along the top of the main fore and aft bulkheads. I assume these will later be used to screw down the seat pans (haven't read that far ahead in the plans yet).

 I then finished up the attach angles, installed nutplates in the ribs and angles, then riveted the ribs and attach angles to the forward spar (no pictures at all - totally forgot to take any).

 After that, they have you fabricate a couple of close tolerance spacers that are used to make sure that the two bulkheads are exactly the right distance apart when they are finally riveted and bolted together.

 Here is one of the two spacers - they have to be exactly 1 7/16 inches long. I cut them a bit long on the band saw then chucked them into my drill press and snuck up on the correct dimension by running the tubing up against a fine metal file on the drill press table. This also ensures that they are exactly square on each end.

From Fuselage
The last thing to do is to make a couple of precision wood spacers (also 1 7/16" thick) to test how the wing spars will fit. These are drilled oversize where the spar attach bolts go, then the entire thing is bolted together to validate that everything is assembled and fits correctly.

From Fuselage
You can also see the bushings for the fuel lines have been installed in the forward ribs. They are the black nylon parts.

Sunday, October 21, 2012

October 21st, 2012

Worked on the F-904 bulkhead this week.  This assembly is really beefy - the wing spars bolt into each side.  The two major fore and aft bulkheads actually came with the wing because they are precision match drilled to the wing spar and are shipped as a unit.

Here's the assembly clecoed together just to get a feel for how everything goes together. The 4 small ribs are where some cover plates will be bolted - fuel lines run through holes in the ribs. The fuel selector and fuel pump will mount in a center section between the two large ribs. We're looking at the forward side of the bulkhead.

From Fuselage
Once it was all clecoed together, Van has you install the main spar bolts (*very* tight fit - they are precision bolts and the holes have been reamed to the exact size) to hold everything in alignment, then match drill the F904C/D left and right components to the F904A & B bulkheads.

From Fuselage
There are also a number of holes which are either enlarged or laid out and drilled for 5/8" nylon bushings. These are used for rudder cable and wiring bundle runs. These are drilled with a step drill for a nice clean hole.

From Fuselage
Here is the aft bulkhead's corresponding holes after drilling with the step drill. The holes will receive a nylon bushing and will be used to for wire runs.

From Fuselage
The control column assembly mounts to the aft side of the aft bulkhead. The two F633-L/R brackets need to be match drilled and machined down to size for lightening. Here I'm match drilling the F633-L to the aft 904 bulkhead (match drilling means you back drill through an existing hole in the bulkhead into the bracket). This ensures proper alignment of the holes. I put a centerline down the back side I can see through the hole to make sure all is lined up correctly.

From Fuselage

Once they were match drilled, I used to band saw to trim off the extra metal (Van's has a cutting diagram) then spent a couple of hours filing and polishing to get to this:

From Fuselage
Not sure I'd do it again - took a lot of work to drop a few ounces, but I'm pleased with the result, so no regrets. 

Since I had the control column mounts done, I went ahead and put the control assembly together. Van recommends doing it while there is plenty of room to work. Once it's all together it's set aside until it's needed much later in the project.

 Here I'm working on finding all the bolts and working out how it all fits together. Although most of the parts are prefabbed and powder coated (they are steel), a number of holes have to be drilled to size and the bushings need to be final ground to fit.

From Fuselage

There are specific numbers and thicknesses of washers used to ensure no slop in any of the parts. Really fun trying to work all these washers in such a tight spot.  I can see why they have you do this while it's easy to get to (although you'll still have to do it in a tight spot later, since there is no way to leave this bolt in place).

From Fuselage

Here's the entire assembly after putting everything together and getting it all lined up.

 The column mounts on the back side of the bulkhead. The columns come up through the seat floor (so the stick ends up being just aft of your knees) and your legs go over the bulkhead. I had to put it on the floor to see how it all worked. The controls feel just like the demo plane I flew in - absolutely smooth as butter and no slop whatsover. Wonderful feel.

From Fuselage
Once all the fitting is done the sides are riveted on.

From Fuselage
Finished up the week fabricating and drilling the attach angles that will serve as doublers behind the ribs mounted to the forward bulkhead.